High temperature coke discharge pyrolysis plant

Waste plastic waste tire cracking project

Author:Shangqiu Seden Time:2018-03-28

 废塑料废轮胎裂解项目.jpg

The use of high-temperature hot slag removal equipment is an upgrade to the usual slag design method. The equipment can be cooled to 220 degrees to produce slag, which saves the cooling time of the entire equipment and effectively improves the equipment production efficiency. Taking 15 tons of processing capacity as an example, 22 hours of furnace treatment can be achieved, which saves 4-5 times more than the conventional ordinary cooling slag discharge. hour.